
Piece of plaster cut to size for half the ceiling.
Our "plank" with the "lifters" attached. (Love the technical jargon!)

Finally the plaster is up on the support. Just a further lift up to the top.

View of the framwork ready to hold the plaster.

Daubs of stud adhesive to hold it tight before all the screws hold it firmly. The lifting aparatus will stay in place overnight as per the instructions on the adhesive pack.