Anne's Stuff

Sunday, September 17, 2006

Wardrobe Chapter 4












Bracing the plasterboard until the adhesive sets











Fixing the shelf supports to the back rail













The outside plasterboard in place

Sunday, September 03, 2006

Father's Day 2006 at Churchill National Park, Rowville, Victoria

THE new FAMILY car!














Trish and Zac













A bit more practise and Zac will be walking


















Ralf holding Zac 'cos he lost his shoes














Trish road testing her new Melbourne Cup hat



















Moira and Jo walking off the luscious chocolate cake

Saturday, September 02, 2006

Wardrobe Chapter 3

Piece of plaster cut to size for half the ceiling.
Our "plank" with the "lifters" attached. (Love the technical jargon!)
Finally the plaster is up on the support. Just a further lift up to the top.
View of the framwork ready to hold the plaster.
Daubs of stud adhesive to hold it tight before all the screws hold it firmly. The lifting aparatus will stay in place overnight as per the instructions on the adhesive pack. Posted by Picasa